Forum
Owner Project Requirement Traceability
Quote from wirelert on November 11, 2025, 8:11 AMDuring a preconstruction audit, we realized that some critical owner requirements weren’t traceable in either the drawings or the specifications. This gap makes it difficult to prove compliance once construction begins. Our QA/QC framework doesn’t currently include OPR-to-design traceability checks. What’s the most efficient way to embed OPR verification into the constructability review cycle? We want accountability without adding redundant documentation steps.
During a preconstruction audit, we realized that some critical owner requirements weren’t traceable in either the drawings or the specifications. This gap makes it difficult to prove compliance once construction begins. Our QA/QC framework doesn’t currently include OPR-to-design traceability checks. What’s the most efficient way to embed OPR verification into the constructability review cycle? We want accountability without adding redundant documentation steps.
